In December of 2023, Tamarack Valley drilled eleven 2-mile lateral legs in their 102/03-18-075-25W4 Clearwater well in the heart of Marten Hills. The open-hole well extends to a combined 33,636 meters from the 11 legs drilled in 3 stacks, placed in a wine rack pattern in the 20 meter thick sand package.