In December of 2023, Tamarack Valley drilled eleven 2-mile lateral legs in their 102/03-18-075-25W4 Clearwater well in the heart of Marten Hills. The open-hole well extends to a combined 33,636 meters from the 11 legs drilled in 3 stacks, placed in a wine rack pattern in the 20 meter thick sand package.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed